Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Sat Jun 8 18:34:39 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search

Blog Entry# 5328367
Posted: Apr 29 2022 (17:08)

No Responses Yet
General Travel
7068 views
0

Apr 29 2022 (17:08)  
MrMultiTalented~
MrMultiTalented~   2470 blog posts
Entry# 5328367               Past Edits
Jamalpur Rail Engine Factory Jamalpur will not do the work of Electric Locomotive POH in the financial year 2022-23. Whereas the Kashtapara Rail Factory will do POH of about 96 electric locomotives in the current financial year.
Jamalpur Rail Engine Factory Jamalpur will not do the work of Electric Locomotive POH in the financial year 2022-23. Whereas the Kashtapara Rail Factory will do POH of about 96 electric locomotives in the current financial year. It is a matter of relief that the infrastructure for POH of Electric Locomotive at Rail Locomotive Factory Jamalpur will be prepared in the first three quarters of the current financial year.
Chief
...
more...
Workshop Engineer of Eastern Railway wrote a letter to the Railway Board
It has been told that Sumit Sarkar, Chief Workshop Engineer, Eastern Railway, has written a letter to this effect to the Director Mechanical Engineer (P) I, Railway Board on 25 April. In this, he has said that for the current financial year 2022-23, the Kashtapara Rail Workshop has been given the workload of 55 WAG-7, 10 WAG-9H and 31 other Electric Locomotive POH.
Two Electric Locos Delivered
Whereas Jamalpur factory has got the workload of two WAG-7, which is already there. Work load of Electric Locomotive POH has not been given to Rail Locomotive Factory Jamalpur in the financial year 2022-23. Whereas two electric locos have been given here to provide basic facilities for POH.
Electrification work and track alignment work being completed
It has also been clarified in the letter that during this time the overhead electrification work and track alignment work is being completed in the locomotive factory. A target has been set to complete both these works by 30 September 2022. After this, POH work of electric loco can be done in Rail Locomotive Factory Jamalpur also.

Jamalpur/Munger

Translate to English
Translate to Hindi

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy