These existing LHB rake trains might not go beyond 130 KMPH.
These routes are slated to be upgraded to 160 KMPH for semi high speed train with new set of rakes.
Also SR don't have loco to test at 160 KMPH. It needs to lend WAP5 loco for 160KMPH test run.