Statutory inspection of RE works followed by speed trial at full sectional speed (100Kmph) in Aluabari–Siliguri (74.2RKM/88.3TKM) single line section of Katihar Division of NFR completed successfully. With this total commissioning by CORE during (2022-23) is 2346.2RKM/3124.1TKM