It is basically poor planning. In addition to electrification , electric loco sheds are to be provided so that the trains can run with Electric engines. Karnataka,Rajasthan are among the mainland states with worst track record of Railway electrification, besides North East. Even today trains to Jaipur ,capital of Rajasthan, run with Diesel locos.