Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Sun Sep 15 20:22:23 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

Blog Entry# 6130296
Posted: Jul 19 (20:29)

4 Responses
Last Response: Jul 20 (12:08)
Rail News
13138 views
2

IR Affairs
SWR/South Western
Jul 19 (20:29)   Bengaluru Suburban Railway Project to Procure Vande Bharat Metro Coaches Through Equity Funding

Exynos9611~   19291 news posts
Entry# 6130296   News Entry# 561173         Tags   Past Edits
2 compliments
Useful Useful
After no bids, K-RIDE to knock on Railways doors for Vande Bharat metro coaches for Bengaluru Suburban Railway Project

The Karnataka Rail Infrastructure Development Company Limited (K-RIDE) has decided to procure Vande Bharat metro coaches for the Bengaluru Suburban Railway Project (BSRP) through equity funding after receiving no financial bids for rolling stock on the Public Private Partnership (PPP) model. Three firms that qualified for the bidding process –...
more...
Bharat Heavy Electricals Limited, Bharat Earth Movers Limited, and Spanish rail manufacturer CAF – did not submit financial bids, citing a need for sovereign guarantees. K-RIDE has requested the Integral Coach Factory (ICF) in Chennai to supply the coaches, with some design modifications to meet BSRP specifications. The coaches will be supplied until 2030, with production starting in 2025-26. K-RIDE is confident of procuring the rolling stock before the commissioning of the first corridor, which is expected to be completed by December 2025. BSRP is divided into four corridors: Sampige (41.4 km), Mallige (25.01 km), Parijaatha (35.52 km), and Kanaka (46.24 km). Corridor 2 (Mallige line) connects Benniganahalli to Chikkabanavara via Hebbal and Yeshwanthpura, and is currently 25% complete.

Bengaluru Suburban Railway Project (BSRP) ke liye, K-RIDE ab equity funding se Vande Bharat metro coaches kharidega, kyunki PPP model pe rolling stock ke liye koi financial bid nahi aayi. Bharat Heavy Electricals Limited, Bharat Earth Movers Limited, aur Spanish rail manufacturer CAF, teenon companies jo bidding process ke liye...
more...
qualified the, financial bid submit nahi kiye, unhone Karnataka Government aur Centre se sovereign guarantees ki demand kari thi. K-RIDE ne Chennai mein Integral Coach Factory (ICF) se coaches kharidne ka request kiya hai, lekin BSRP ke requirements ke mutabik design mein kuchh changes karne honge. Coaches 2030 tak supply honge, aur production 2025-26 mein shuru hoga. K-RIDE ko confidence hai ki pehle corridor ke commissioning se pehle rolling stock mil jaayega, jo December 2025 tak complete hone wala hai. BSRP mein chaar corridors hain: Sampige (41.4 km), Mallige (25.01 km), Parijaatha (35.52 km), aur Kanaka (46.24 km). Corridor 2 (Mallige line) Benniganahalli se Chikkabanavara tak Hebbal aur Yeshwanthpura se hoke jata hai, aur iska 25% kaam complete ho chuka hai.

2 Public Posts - Fri Jul 19, 2024

8830 views
0

Jul 19 (21:05)
Exynos9611~
Exynos9611~   23860 blog posts
Re# 6130296-3              
corruption in k ride at its peak seems like they ate all funds alloted to bsrp so that the projects deadline and cost gets increased more
Translate to English
Translate to Hindi

1 Public Posts - Sat Jul 20, 2024

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

3619297 ★★★ 398HBR^~
3368675 ★★★ 396mr.train_wala~
6007860 ★★★ 117RailwayFiles~
6186110  14Rail_0326~
6186432 ★★★ 43PankajMishra^~
4402199 ★★★ 264AvishekRay~
4387942 ★★★ 61AvishekRay~

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy