News Entry# 0
JCO 07.04.2023 is cancelled • To run with LHB rake in place of conventional rake w.e.f. 17.02.2023 to 05.05.2023. The revised coach compostion would be AC 2 Tier - 1, AC 3 Tier - 2, Sleeper Class - 10, General 2nd Class - 4, EOG - 2/ Total = 19 coaches. 🔹To Run with LHB Rake with revised coach compostion WEF 12.05.2023 Ex. VSG. 🔹New Coach Composition : 2A - 4, 3A - 5, 3E - 4, Sleeper Class - 2, General Class Coaches - 2 & EOGs - 2. Total = 19* LHB Coaches. * As & when availability of AC I Tier Coach and One Pantry Car will be Attached (i.e. Total load will be 21 LHB Coaches).
News Entry# 0
• To run with LHB rake in place of conventional rake w.e.f. 17.02.2023 to 05.05.2023. The revised coach compostion would be AC 2 Tier - 1, AC 3 Tier - 2, Sleeper Class - 10, General 2nd Class - 4, EOG - 2/ Total = 19 coaches.
🔹To Run with LHB Rake with revised coach compostion WEF 12.05.2023 Ex. VSG. 🔹New Coach Composition : 2A - 4, 3A - 5, 3E - 4, Sleeper Class - 2, General Class Coaches - 2 & EOGs - 2. Total = 19* LHB Coaches. * As & when availability of AC I Tier Coach and One Pantry Car will be Attached (i.e. Total load will be 21 LHB Coaches).