Total of 218.6Km rail line in which 163.9 will be gauge converted and 54.7Km new line will be constructed. Gauge conversion will happen between MLN/Mailani to PLK/Palia Kalan (30.1Km) and BXM/Belrayan to BRK/Bahraich (133.8Km) moreover new line of 54.7Km will be constructed between PLK/Palia Kalan and BXM/Belrayan which will have 5 new stations (Maleneya - Majhgain - Lodhpurwa - Nighasan - Singahi) including 7 major bridges (First four between Majhgain and Lodhpurwa, first bridge at 17.5Km second bridge at 18.5Km third bridge at 22.2Km and fourth bridge at 24.34Km) rest two bridge will be constructed between Nighasan and Singahi at 41.22Km and 46.56Km respectively however last bridge (seventh bridge) will be constructed at 48.15Km between Singahi and BXM/Belrayan.