Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Wed Jun 5 19:57:16 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search

Blog Entry# 3212159
Posted: Mar 17 2018 (13:59)

35 Responses
Last Response: Mar 22 2018 (21:46)
Info Update
13985 views
9

Mar 17 2018 (13:59)   BIDR/Bidar (3 PFs)
Arun
Arun   1967 blog posts
Entry# 3212159            Tags  
Bidar - Kolhapur new train approved. Nothing much given.
.
Source: click here
.
Translate to English
Translate to Hindi

31 Posts

4043 views
1

Mar 22 2018 (19:21)
TheLoneWanderer
TheLoneWanderer   8062 blog posts
Re# 3212159-32              
I guess the long layover issue is gone ...the rake is being parked in the parking lines adjacent to pitlines in SBC yard and only being shunted to PF at 6'o clock in the evenig...
there were two proposal from SWR and SCR for this cause..
from SR : It was to use the rake of Charminar to run it as HYB-MAS-SBC-KCG and vice versa - Agreed and even SCR changed the CC of both these trains to match the RSA ...not sure what happened to this proposal and the train which
...
more...
were announced were never came to existance
from SWR : it was to use to extend the SBC SF to MYS ... it was rejected by SCR because of the king of TT being given to run between SBC-MYS as SBC SF itself already running with a stamp average of 55 ..any further increase in TT may have to lose its SF Tag as SWR is giving a Run time of 3 hours (it was not electrified and single line at the time of proposal) ..not sure about the current status..
.
and regarding the 12735 GR, with lot of complaints and requests and fhights with board level by showing the stats how 12735/36 were used to give revenue with the old 7:10/7:40 arrival slots at YPR to the then arrival slots of 11AM/9:40AM and the worst of all aorund 2-4 PM departures and 4 AM arrival at SC, they got this new slot and change in the days of opeartoins.. that i swhen the fate is changed as its running mostly 100% occupation even thought its a 9 coach train and lost most of its coaches to its twin brother VSKP gr and few coahces are being used as spares ...again they changed it to 9:40 arrival in the month of January and february and it again lost its shine and used to run empty...now again its back to its 100% occupancy run ..have to see what else they are going to do with this GR..

Translate to English
Translate to Hindi

4620 views
0

Mar 22 2018 (19:23)
CoringaExpress~
CoringaExpress~   5182 blog posts
Re# 3212159-33              
Any info whether it is a New train via LRR or extension of KOP-SUR via GR ?
Translate to English
Translate to Hindi

4037 views
0

Mar 22 2018 (19:26)
TheLoneWanderer
TheLoneWanderer   8062 blog posts
Re# 3212159-34              
extension kastam emo ? it has to undergo mantenance at SUR kada ...if its shifted to Bidar ..does this get enough tat for PM at Bidar pitlines ?
Translate to English
Translate to Hindi

4146 views
1

Mar 22 2018 (21:46)
SBCKLBGVandeSadharana~
SBCKLBGVandeSadharana~   10625 blog posts
Re# 3212159-36               Past Edits
Nothing is written about if its via Kalaburgi. It only says it will benefit Pandharpur & Kolhapur visitors.
Translate to English
Translate to Hindi

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

5211980 ★★★ 33ankit0507~
1870067 ★★★ 224GondwanaExpress^~

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy