Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Fri May 10 19:34:57 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search

Blog Entry# 1599213
Posted: Sep 25 2015 (06:55)

8 Responses
Last Response: Sep 26 2015 (14:10)
1 Followers
Info Update
7000 views
9

Sep 25 2015 (06:55)   X10001/Satpura Express (NG) | JBP/Jabalpur (7 PFs)
 
robin~
robin~   6144 blog posts
Entry# 1599213            Tags  
#jbpnews
#JBPGBGPROJECTUPDATES
#JBPKEQTRIPLINGPROJECT
Now only 5 days are left for the historical NG section of JBP-NIR to be vanished from the IR network and before that moment to be happened the planning of pacer execution of JBP-NIR-BTC BG project is started and below are some important points-
1-Before
...
more...
the Megablock WCR being allotted the SECR Howbagh land after RB Approval.
2-Now WCR can make many plans to use that Howbagh land either for commercial use or for new washing appron/parking yard as part of the making of terminal of MML stn. in near future and for that WCR already sent fresh proposal to RB and now WCR is just waiting for the approval.
3-SECR is also handing over the work of making New BG/3rd line b/w KEQ(Kachepura)-JBP as part of JBP-BTC-G BG project so that movement of G/BTC/NIR bound trains frm JBP shud be easier and they dont have to wait at any signal for clearance and WCR also sent one proposal for the 3rd line b/w KEQ-JBP to RB and hopefully it will be approved and 3rd line will b crossing under the unused area of shastri bridge as shown in the pic.
4-In near future most of the passengers goin towards NIR/BTC/G will be given halt at KEQ and for this new stn. building is being constructing and one big ramp is constructing over the drainage with the help of JBP NNJ so that platform can be built on it.
5-It good to see nw SECR and WCR is working together and taking responsiblity to complete either one or two work comes under this project very fastly and this bonding will help this imp. project to complete soon.
6-New BG Line b/w Sagda-KEQ is goin to be built and for this sleepers also being layed new KEQ and as soon as base survey will b over new line will b layed. And on this sectio Garha st. also comes which will become a main stn. for SECR to handle and passing the JBP/G/BTC/NIR bound trains by halting them at Garha and passing other trains.
7-JBP-NIR-BTC-G section will be electrified in near future along with BGFied
8-KEQ stn. will play a role like link Jn. from where G/BTC bound new BG line will be diverting towards G/NIR/BTC and it is sure that as soon as this shorter route will be open in near future most of the south trains will chose this route as thier favorite bcoz of timesaving and non congestion.
9-IT is quite sure that this time JBP-G BG project will b over asap as both SECR n WCR is seriously giving efforts to complete this high importance project soon.
10-Now after closure of JBP-BTC NG section it is sure that work of BG will get very high pace and it is quite sure that future for JBP Jn. is very much brighter and JBP jN. will become a gr8 Jn. for south corridor in near future.

Translate to English
Translate to Hindi

6 Posts

3191 views
2

Sep 25 2015 (16:44)
robin~
robin~   6144 blog posts
Re# 1599213-7              
third line will decongest the route b/w JBP-KEQ and trains will pass quickly either for ET side/BTC/G side so this is a big and imp. move by WCR and this third line will be beneficial for both WCR n SECR for the easy movement of trains either passenger/goods and the new route will be open for Goods trains also to reach southern stn. asap thru JBP-KEQ-BTC-G-BPQ and once the electrification of whole routes such as ALD-JBP-ET and JBP-BTC-G will be done then goods can run with WAG9 and other machos of elocos for faster transport of goods so next 1-2 yrs is very very bright for JBP in terms of rail connectivity and development
Translate to English
Translate to Hindi

3054 views
0

Sep 25 2015 (18:10)
guest   1284 blog posts
Re# 1599213-8              
thanks for share
Translate to English
Translate to Hindi

3238 views
1

Sep 26 2015 (14:10)
robin~
robin~   6144 blog posts
Re# 1599213-9              
rush started in NG trains of JBP-NIR-BTC trains due to megablock which will start from october1 2015
Translate to English
Translate to Hindi

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy