Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Thu Aug 1 21:28:13 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
RailCal Android App
RailCal iPhone App
Post PNRPost BlogAdvanced Search

BNZ/Badshahnagar (3 PFs)
बादशाह नगर
بادشاہ نگر


Track: Double Electric-Line

Updated: Apr 04 2023 (14:14)
Show ALL Trains
Badshah Nagar Chauraha, Faizabad Rd, Near Indira Bridge, Lucknow. Pin - 226006
State: Uttar Pradesh

Elevation: 117 m above sea level
Type: Regular   Category: NSG-4
Zone: NER/North Eastern   Division: Lucknow NER


No Recent News for BNZ/Badshahnagar
Nearby Stations in the News
Number of Platforms: 3
Number of Halting Trains: 48
Number of Originating Trains: 0
Number of Terminating Trains: 0
1 Follows
Rating: 4.2/5 (40 votes)
cleanliness - good (5)
porters/escalators - good (5)
food - good (5)
transportation - excellent (6)
lodging - good (4)
railfanning - excellent (5)
sightseeing - good (5)
safety - excellent (5)
Show ALL Trains

Station Forum

Page#    Showing 1 to 5 of 295 blog entries  next>>
Info Update
6631 views
1

Today (17:29)   12958/Swarna Jayanti Rajdhani Express | MMCT/Mumbai Central (5 PFs)
Nothingispermanentvalid~
Nothingispermanentvalid~   520 blog posts
Entry# 6143019            Tags   Past Edits
1 compliments
Agree
In my opinion railways should make future train sets with this coach composition 6 general class coaches , 6 sleeper coaches , 8 ac class coaches ( 1 ac coach or 2 ac coaches can be removed to add pantry car coach or extra luggage coach) , (which can include third ac or second ac or first ac or can be a mixture of these coaches ) and so 6+6+8 total 20 and 2 electric locos ( 1 at front side of whole trainset and 1 at back side of the whole trainset ) so 20 +2 total 22 so that instead of giving lhb rakes to some trains which runs on a longer path railways should directly convert those mail or express or superfast express trains into these trains sets and cost of making lhb coaches will also be reduced due to directly conversion of mail or express...
more...
train into train sets and rake reversal time of many trains will be reduced cost of doing rake reversal of a train will also be reduced ( due to 2 engine 1 at back side of the trainset and 1 and front side of the train set ) and speed of all trains can be increased (due to 2 engine 1 at back side of the trainset and 1 and front side of the train set ) . Please give your opinion on this but please don't give any argument related to politics so that i can save my post from getting archived.

Translate to English
Translate to Hindi

More Posts
Info Update
61931 views
0

Jul 24 (23:42)   19409/Sabarmati - Gorakhpur Express (PT) | BKN/Bikaner Junction (6 PFs)
Nothingispermanentvalid~
Nothingispermanentvalid~   520 blog posts
Entry# 6135484            Tags   Past Edits
In my opinion railways should start a new tri weekly train between Gomti Nagar (Lucknow) and Bikaner or either between between Lucknow Junction and Bikaner Junction via Kanpur Central , Farrukhabad jn , Kasganj jn , Mathura jn , Achhnera jn , Bharatpur jn , Jaipur jn , Sikar jn , Ratangarh jn and primary maintenance of this train should be done at Pitlines of Gomtinagar station and this train will need only 1 icf rake only and from Gomti Nagar or Lucknow to Bikaner on Tuesday , Thursday , Saturday and Bikaner to Lucknow or Gomti Nagar on Tuesday , Thursday, Saturday. And for further information refer to these blogs - (6138182, 6138183)

And
...
more...
Railways should also run a new tri weekly train between Jodhpur and Gomti Nagar (Lucknow) or Jodhpur to Lucknow Junction via Jaipur jn , Bharatpur jn , Mathura jn , Kasganj jn , Farrukhabad jn , Kanpur Central and primary maintenance of 1 icf rake of this train should be done either at pitlines Jodhpur station or at pitlines of Bhagat Ki Kothi station and Jodhpur to Lucknow Junction or Gomti Nagar on Tuesday , Thursday , Saturday and Gomti Nagar or Lucknow Junction to Jodhpur on Wednesday , Friday , Sunday. And for further information refer to these blogs - 6079787 , 6079788

Translate to English
Translate to Hindi

More Posts
Info Update
20438 views
3

Jul 16 (19:18)   LKO/Lucknow Charbagh NR (9 PFs)
PrakharYadav
PrakharYadav   14304 blog posts
Entry# 6127205            Tags   Past Edits
आवश्यक सूचना !

15 जुलाई 2024 से लखनऊ मेट्रो रेल की सेवाएं

रात्रि 10 बजे की जगह रात्रि 10:30 बजे तक उपलब्ध रहेंगी
...
more...

दोनों टर्मिनल स्टेशन मुंशीपुलिया और CCS एयरपोर्ट से आखिरी ट्रेन रात 10:30 बजे रवाना होगी।

Translate to English
Translate to Hindi
Info Update
149316 views
2

Jun 12 (01:06)   19715/Jaipur - Gomti Nagar Express | GTNR/Gomti Nagar (Lucknow) (6 PFs)
Nothingispermanentvalid~
Nothingispermanentvalid~   520 blog posts
Entry# 6092516            Tags   Past Edits
1 compliments
Useful
Railways should run a new tri weekly train between Bikaner Junction and Lucknow Junction via Sikar , Bharatpur , Kasganj , Kanpur Anwarganj and for further information refer to these blogs - 6079788 , 6079787 or refer to below given links -

/train/228909

...
more...
/train/228912

And for extra information refer to these blogs -

/train/225257

/train/225259

/train/225261

/train/225264

Translate to English
Translate to Hindi
General Travel
115000 views
3

Jun 27 (17:26)   15904/Chandigarh - Dibrugarh Express (PT) | SHG/Shahganj Junction (4 PFs)
Ehtram Husain~
Ehtram Husain~   21938 blog posts
Entry# 6107402            Tags   Past Edits
1 compliments
Useful
कृपया ध्यान दें...
गोंडा-बुढ़वल तीसरी लाइन निर्माण के परिप्रेक्ष्य में गोंडा कचहरी-मैजापुर-करनैलगंज स्टेशनों के प्री नॉन इंटरलॉकिंग/नॉन इंटरलॉकिंग कार्य के कारण निम्न गाड़ियों को उनके सामने अंकित तिथियों में रि-शिड्यूलिंग/नियंत्रण, शार्ट टर्मिनेशन/शार्ट ओरिजिनेशन कर चलाया जायेगा।
Translate to English
Translate to Hindi
Page#    Showing 1 to 5 of 295 blog entries  next>>

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy