Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Thu Jun 27 00:51:13 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search
Large Station Board;
Entry# 794214-0

VJR/Vijaynagar (1 PFs)
विजयनगर
विजयनगर


Track: Construction - Double-Line Electrification

Updated: Mar 02 (11:00)
Show ALL Trains
Miraj Road
State: Maharashtra

Elevation: n/a
Type: Regular   Category: NSG-6
Zone: SWR/South Western   Division: SSS Hubballi (Hubli)


No Recent News for VJR/Vijaynagar
Nearby Stations in the News
Number of Platforms: 1
Number of Halting Trains: 6
Number of Originating Trains: 0
Number of Terminating Trains: 0
0 Follows
Rating: NaN/5 (0 votes)
cleanliness - n/a (0)
porters/escalators - n/a (0)
food - n/a (0)
transportation - n/a (0)
lodging - n/a (0)
railfanning - n/a (0)
sightseeing - n/a (0)
safety - n/a (0)
Show ALL Trains

Station Forum

Page#    Showing 6 to 10 of 21 blog entries  <<prev  next>>
General Travel
224895 views
3

Aug 21 2023 (21:39)   16210/Mysuru - Ajmer Express (PT) | VJR/Vijaynagar (1 PFs)
AZT~
AZT~   3217 blog posts
Entry# 5803332            Tags  
1 compliments
Great
1 hour before time running Ajmer bound train standing in main line waiting for its turn to enter Miraj junction.
It was running much ahead of Rani Chenamma. Rani Chennemma arrived later and proceeded first to its final destination.
DOC: Aug 11, 2023
Translate to English
Translate to Hindi

More Posts
General Travel
121199 views
8

Jun 08 2023 (23:13)   LD/Londa Junction (3 PFs)
LHB_for_18047~
LHB_for_18047~   10850 blog posts
Entry# 5746317            Tags   Past Edits
1 compliments
Great
Ugar to Vijaynagar doubling done. Tomorrow CRS inspection and speed trial.
Part of Londa Miraj track doubling.
Now only stretches in this entire section pending are Kudachi to Ugar (progress is good and can be commissioned soon) and Vijaynagar to Miraj (will take time slow progress spotted on 12.04.2023).
Translate to English
Translate to Hindi

More Posts
General Travel
195181 views
13

★★
Apr 17 2023 (11:30)   12779/Goa Express (PT) | SVM/Sanvordem (Kudchade) (3 PFs)
LHB_for_18047~
LHB_for_18047~   10850 blog posts
Entry# 5696672            Tags   Past Edits
5 compliments
Useful Great Useful Useful Useful
Few updates from my recent trip in 12779 on 13.04.2023.
1. 12779 CC is exactly reversed by SWR except the 2 parcel vans.
2. Spotted 8 brand new LHB coaches consisting of 6 GS and 2 3ACE coaches most probably for Goa express at Kalem.
3. SVM to Kalem FEDL updates Total 10 kms. SVM outers ground works going on at good pace and
...
more...
the bridge outside SVM ready too, ground works at good progress for around 1km, further around 2 kms no works done most probably some land issue, then for around 7kms double line fully laid till Kalem. Regarding electrification the existing line is electrified and on the new line poles are laid. If the work on the middle 2 kms start immediately now the section can be doubled in next 6 months.
4. Kalem to Kulem existing single line already electrified and doubling works have just begun from Kulem railway station.
5. Kulem to Castle Rock no doubling work, but electric poles have been or are being put up at all places except the tunnels.
6. Castle Rock to Tinaighat doubling update: from CLR for around 30% of the section no work but for remaining around 70% ground fully levelled now ballast laying to commence. Electric poles have but put up besides the area levelled for double line. At CLR I think only the mainline is under wires (not fully sure) but other tracks only poles have been put up wiring still left.
7. LD to Kudachi if fully doubled now and Kudachi to Vijaynagar doubling almost done can be commissioned in next 2 to 3 months. could not notice electrification coz of darkness but poles are definitely there entire route could not or did not see the wiring though.
8. Vijaynagar to MRJ doubling going at slower pace compared to Kudachi Vijaynagar. My trip ended at MRJ.

Translate to English
Translate to Hindi

More Posts
0
updating ...
10 wishes
शुभ यात्रा Happy Journey Happy Journey शुभ यात्रा Happy Journey शुभ यात्रा ನಿಮ್ಮ ಪ್ರಯಾಣ ಸುಖಕರವಾಗಿರಲಿ Happy Journey May you witness many, many overtakings. Happy Journey
On trip series..... Day no 3 ....... Train no 3........

312 Posts

FmtBlog
14805 views
0

Apr 15 2023 (08:09)
VIVEKEXPRESS^~
VIVEKEXPRESS^~   41137 blog posts
Re# 5693467-313            Tags  
@VJR   11m late
@VJR: Vijaynagar &42 km/h Accelerating now after passing a TSR
Translate to English
Translate to Hindi

More Posts
0
updating ...
3 wishes
Happy Journey Happy Journey మీ ప్రయాణం ఆహ్లాదకరంగా సాగాలని కోరుకుంటున్నాను
😍😍😍 Train Number - 11 17416 - KOP TPTY Haripriya Express Journey From MRJ - Miraj Jn. To RU - Renigunta Jn. 😍😍😍

24 Posts

FmtBlog
11198 views
0

Apr 03 2023 (15:20)
MeghaSyam^~
MeghaSyam^~   153947 blog posts
Re# 5683575-25            Tags  
@MRJ 6 km <--> 2 km @VJR   1h 55m late
@VJR: Vijaynagar &31 km/h 30 Kmph 👍
Translate to English
Translate to Hindi

FmtBlog
10758 views
0

Apr 03 2023 (15:24)
MeghaSyam^~
MeghaSyam^~   153947 blog posts
Re# 5683575-26            Tags  
@VJR   1h 57m late
@VJR: Vijaynagar &1 km/h Stopped Main Line Only 👍
Translate to English
Translate to Hindi

FmtBlog
21200 views
0

Apr 03 2023 (15:25)
MeghaSyam^~
MeghaSyam^~   153947 blog posts
Re# 5683575-27            Tags  
@VJR   1h 58m late
@VJR: Vijaynagar &0 km/h Now 👍
Translate to English
Translate to Hindi

FmtBlog
10362 views
0

Apr 03 2023 (15:36)
MeghaSyam^~
MeghaSyam^~   153947 blog posts
Re# 5683575-28            Tags  
@VJR   2h 9m late
@VJR: Vijaynagar &3 km/h Started Main Line Only 👍
Translate to English
Translate to Hindi

FmtBlog
10074 views
0

Apr 03 2023 (15:41)
MeghaSyam^~
MeghaSyam^~   153947 blog posts
Re# 5683575-29            Tags  
@VJR 4 km <--> 4 km @SED   2h 11m late
@VJR: Vijaynagar &86 km/h 85 Kmph Slow Down 👍
Translate to English
Translate to Hindi

More Posts
Page#    Showing 6 to 10 of 21 blog entries  <<prev  next>>

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy