Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Fri Jun 28 05:14:00 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search
Filters:

Page#    12 Blog Entries  <<prev  next>>
Info Update
212315 views
22

★★★
Jul 04 2015 (14:50)   X10001/Satpura Express (NG) | NIR/Nainpur Junction (5 PFs) | MIB/ZDM-4A/235
 
Arpit~
Arpit~   1197 blog posts
Entry# 1532141            Tags   Past Edits
Yesterday travelled by the HISTORICAL, the ROYAL, QUEEN of NG SATPURA EXP..
1. Arrived NIR jn at 15:15. Reached ticket counter no rush observed. In fact I don't have to wait for a single person.55 rs fare NIR to JBP.
2. Entered at PF 3, loco changed some ZDM 4a to another ZDM 4a #235. Boarded on a coach adjacent to FC though seats were occupied but I did not cared, NG can be enjoyed more on gate. Please be careful while travelling near gate.
3.
...
more...
B/w NIR to Pindrai subgrade laid parallel to existing track.
4. Pindrai to ghusore no works observed. May be a new alignment will exist.
5. Deep cuts are prepared where required I.e. The most time consuming and expensive task.
6. Almost all the bridges are complete or about to complete. Most of the incomplete bridges have slab to cast that's it. Abutment and Piers are already built.
7. Observed upto 14 degree curve on NG. Degree of curve reduced for BG. Thus new alignment taking place.
8. BUQ PF and station building work on full swing.
9. Land levelled for new station at Sukari Mangla.
10. After Jamtara no BG subgrade seen perhaps After BG Gwarighat will be removed as no signs of BG seen.
Conclusion- SECR was trying to consume it's time and fund where work could be done without forest clearence. The cleared section is almost done except ballast and tracks.
Extra note- MFR NIR section is also on full swing.
1. Bridges Ready
2. Subgrade ready
3 no forest clearence issue.

Translate to English
Translate to Hindi

1 Public Posts - Sat Jul 04, 2015

12443 views
1

Jul 04 2015 (17:07)
robin~
robin~   6144 blog posts
Re# 1532141-2              
hey bro nice to see the foto updates of BG work on JBP-NIR section and ur fotos tell that main and time consuming works like building bridges is almost done only proper basework is remaining and nice to see curves are being made by cutting mountains and hope once the NG section will b closed in OCT1 aftr that SECR will not take much time to start the JBP-NIR BG section bcoz most of the work is completed and i think around 70-80 % work is completed btwn JBP-NIR so hope secr will start the section within 6-8 months or less and then start DEMU/Passengr trains frm JBP-NIR atleast and once NIR-BTC BG section will be completd then extend the services further so lets see how works go aftr OCTOBER 1 2015 and aftr 2 months around 1 DEC 2015 NIR-BTC NG section will b closed so hope work will b...
more...
done as good pace in this section also aftr closure and hope till that time forest clearance issue shud b resolved and very thanks for the fotos updates and keep it up in future also
#JBPNIRBTCBGCOVERSION
#JBPGBGPROJECT

Translate to English
Translate to Hindi

5 Public Posts - Sat Jul 04, 2015

13 Public Posts - Sun Jul 05, 2015
1 Followers
Info Update
16323 views
14

★★
Jun 05 2015 (14:26)   JBP/Jabalpur (7 PFs)
 
robin~
robin~   6144 blog posts
Entry# 1500455            Tags  
#JBPGBGPROJECT
Kal hui JBP-G BG projct ki progress ki meeting me decide hua ki sept/oct 2015 tak jbp-BTC ka closure ho jayga and march 2016 tak JBP-Sukrimangala tak BG ban jaygi or march 2017 tak NIR tak BG ban jaygi so ab ye dekhna hoga ki kaam kb shuru hota hai or kitna time lagta hai bt major bridges or bade kaam sb pure ho gaye hai to bhi itna time laga rahe hai pta nai kyu itna time le rahe hai SECR wale
Translate to English
Translate to Hindi

6 Public Posts - Fri Jun 05, 2015

1 Public Posts - Sat Jun 06, 2015

1 Public Posts - Tue Jun 09, 2015

2 Public Posts - Wed Jun 10, 2015

9 Public Posts - Thu Jun 11, 2015
Info Update
16515 views
19

★★★
May 04 2015 (22:09)   BSP/Bilaspur Junction (8 PFs)
 
robin~
robin~   6144 blog posts
Entry# 1454985            Tags  
#JBPGBGPROJECT
Akhir JBP-BTC NG section k band hone ki date aa gayi jo hai OCT 2015 or SECR iss route pe OCT 2015-OCT 2017 tak block le rha hai or DEC 2017 tak JBP-BTC BG nw line chaalu kr di jaygi iska matlab 2017 jbp jn. k liye bahut khaas hai kyunki 2017 march tak ET-JBP-ALD section electrified ho jayga or fir usi saal akhir mahine tak JBP-BTC-G BG route bhi chaalu ho jayga so hope for the best or magar ho sake to SECR ko jbp-btc bg 2016 tak khatam kr 2017 tak shuru kr dena chahiye
Translate to English
Translate to Hindi

1 Public Posts - Mon May 04, 2015

21 Public Posts - Tue May 05, 2015

3 Public Posts - Wed May 06, 2015

1 Public Posts - Thu May 07, 2015

1 Public Posts - Sun May 10, 2015

3 Public Posts - Mon May 11, 2015
Rail News
16789 views
3

Other News
SECR/South East Central
May 04 2015 (13:04)   नई रेल लाइनों से मिलेगी राहत सैकड़ों किमी की दूरी होगी कम
 

asingh601~   39 news posts
Entry# 1454857   News Entry# 223235         Tags   Past Edits
आसान हो जाएगी रायपुर से जबलपुर की यात्रा
आने...

3 Public Posts - Mon May 04, 2015

11268 views
0

May 04 2015 (20:46)
robin~
robin~   6144 blog posts
Re# 1454857-4              

2 Public Posts - Tue May 05, 2015
1 Followers
Info Update
14056 views
13

★★
Apr 14 2015 (02:45)   X10002/Satpura Express (NG) | JBP/Jabalpur (7 PFs)
 
robin~
robin~   6144 blog posts
Entry# 1427912            Tags  
#JBPGBGPROJECT
Now only few days are left when the rail board will decide the date of closure of JBP-BTC NG section after the meeting n discussion with SECR GM also on 15 April 2015 so lets wait for 1 day to see which dates will b decided to close the section fully and it is necessary to close the section soon so that work of BG can progress with pace bcoz from JBP-Nainpur section many places are there where NG is intersecting BG so without closure it is not possible to start the work so on 15 april it will b announced by SECR and i am happy to see the BG start on this route soon but sad also bcoz
...
more...
the century old golden n memorable route will b closed soon for railfans and passengers!!!!

Translate to English
Translate to Hindi

8 Public Posts - Tue Apr 14, 2015

13 Public Posts - Wed Apr 15, 2015

2 Public Posts - Thu Apr 16, 2015

2 Public Posts - Tue Apr 21, 2015

1 Public Posts - Fri Apr 24, 2015

1 Public Posts - Sun Apr 26, 2015

2 Public Posts - Mon May 04, 2015
Page#    12 Blog Entries  <<prev  next>>

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Top Trending Posts

1677141 ★★★ 62Rfchannel121~
6102925  6GaganB
832494  9Mridul^~
6107770  8abdulrazzak123
6107831  6tedybeas
6104928 ★★★ 36kirk781^~
6105916 ★★ 13PankajMishra^~
6106790  7jagdev082
6107408  7Bodhgaya^~
6106789  6PrakharYadav^~
6107754  10AyushBijnor
6106452 ★★★ 89Arya.Rishav~
6107591  6Bodhgaya^~
6093243 ★★ 13arishabh1819~
6107525  9PurushottamExpress...
6106940  8Aranyadham_Express...
6103673 ★★ 19pawanyadav~
5085167  11jishnuthakur12301^...
5076636 ★★★ 30GsTtsg~
5067301 ★★★ 25GsTtsg~
5055939 ★★★ 26GsTtsg~
5029570 ★★★ 27GsTtsg~
5074141 ★★★ 26GsTtsg~
5058435 ★★★ 29GsTtsg~
5047345 ★★★ 26GsTtsg~
5036131 ★★★ 26GsTtsg~
5012527 ★★★ 32GsTtsg~
4968355 ★★★ 30GsTtsg~
5072987 ★★★ 30GsTtsg~
5056876 ★★★ 29GsTtsg~

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy